All elements are produced in our own house factory!

Our office/factory is located just outside Tallinn, at Radisti tee 13, Soodevahe. We produce the building elements in our own house factory. The finished elements are transported directly from the factory to the client's chosen site, where we install them. The production of house parts takes 1-3 months.

We Customize Ready-Made Solutions or Create Custom Projects

We help you develop a suitable house project by either adapting an existing solution to your needs or creating a new project from scratch.

A house project includes the preparation of all construction documentation, as well as the creation of detailed drawings for construction and products, including foundations and specialized sections.

By ordering both the project and construction from one place, you avoid risks and misunderstandings that can arise when multiple parties are involved in building a single house.

What are the steps
to ordering your home?

Choose a house from our catalog and we will customize it to your wishes. You can also come to us with your own project, or if you don’t have a clear vision of your home yet, simply share your thoughts, wishes, or a hand-drawn sketch with us.

Based on the preliminary sketches, we can provide an initial cost estimate for the construction work. The project can then be adjusted according to the budget. Before applying for a building permit, it’s essential to ensure that the construction work fits within the planned budget; otherwise, it’s not worth applying for the permit.

Based on the final project, we prepare production drawings for the elements and start manufacturing the building parts. If the foundation construction is also our responsibility, we begin its construction on the site simultaneously with the production. If preferred, the client can handle the foundation construction themselves.

Once the house parts are ready, we load the elements onto a truck and deliver them to the construction site, where we begin assembling the house. By this time, the foundation should be ready. Typically, we can assemble a weatherproof house shell within 2-3 days.

Depending on the agreed-upon scope of work, we will proceed with on-site construction tasks, which may include exterior and interior work, as well as specialized installations (heating, ventilation, electrical, plumbing, and sewage). The extent of these tasks will be determined during the budgeting phase.

Once all agreed-upon work is completed, we inspect the results and sign the handover acceptance certificate. We also provide the necessary documents for applying for the occupancy permit, as well as usage and maintenance manuals.